by Matt Jordan | Sep 18, 2026 | Construction Surveying
On a civil project you will hear both terms used, sometimes as if they mean the same thing. They do not. Engineering survey and construction setout are closely related, and they often involve the same people and gear, but they cover different ground. Knowing where one...
by Matt Jordan | Sep 18, 2026 | Construction Surveying
On major civil jobs, survey work does not just happen and get trusted. It gets checked. The principal’s surveyor, the client, or an independent reviewer verifies that control, setout, and as-built records meet the spec and sit inside tolerance. This check goes...
by Matt Jordan | Sep 18, 2026 | Construction Surveying
Before a single peg goes in the ground, a civil project needs a set of trusted survey points to work from. That set of points is the control network. It is the quiet foundation under every measurement on site. Most people never think about it, which is fine when it is...
by Matt Jordan | Sep 18, 2026 | Construction Surveying
Setout is one of the first survey jobs on a civil site. It means marking the design onto the ground so crews know where to build. Pegs, marks, and reference lines show where a kerb, pile, pit, or slab edge goes. When setout is right, work flows smoothly. When it is...
by seo-onlineoptimisation | Jul 15, 2026 | Uncategorized
Ask a scanning provider how accurate their scanner is and you will get a number off the specification sheet. Ask how accurate your finished deliverable will be and you should get a longer, more careful answer. This article does not quote a single accuracy figure,...